making yet more progress

| | Comments (0) | TrackBacks (0)

Now we have the sewer and water mains run into the basement and the backfill completed! Starting to take some shape.
gallery for May 10, 2008

0 TrackBacks

Listed below are links to blogs that reference this entry: making yet more progress.

TrackBack URL for this entry: http://budobeer.com/cgi-bin/mt/mt-tb.cgi/25

Leave a comment

About this Entry

This page contains a single entry by Al published on May 10, 2008 3:50 PM.

Drain tile and partial backfill was the previous entry in this blog.

drain pipes is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.01